CONNECTION TEST FUNCTION
During the test, the DIRIS must have current and
voltage for each of the phases.
In addition to this, the function recognises the PF
of the installation as being between 0.6 < PF < 1. If
the PF of the installation is not within this range, this
function cannot be used.
In 4 BL/3 BL/2BL/1 BL, the connection of the CTs is
controlled only.
In 4NBL and 3NBL the connection as a whole is
controlled.
Do check that these are the right conditions:
Err 0 = no error
Err 1 = CT phase 1 inverted
Err 2 = CT phase 2 inverted
Err 3 = CT phase 3 inverted
Err 4 = V1 and V2 voltages inverted
Err 5 = V2 and V3 voltages inverted
Err 6 = V3 and V1 voltages inverted
For the Err 1, Err 2 and Err 3, the modification can
be performed automatically by the DIRIS or manually
by correcting the current connections.
For the Err 4, Err 5 and Err 6 the modification must
be performed manually by correcting the voltage
connections.